Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,199
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0370 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,289 | $150 | Not Implemented |
AS0370 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,258 | $39,378 | Not Implemented |
AS0370 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,336 | $12,650 | Not Implemented |
AS0370 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,545 | $16,000 | Not Implemented |
AS0370 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,794 | $1,844 | Not Implemented |
AS0370 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,372 | $5,500 | Not Implemented |
MA0546 # 01 Y:2004 | 01 | 2004 | INSTALL OCCUPANCY SENSORS | $16,130 | $4,480 | Not Implemented |
MA0546 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $13,348 | $4,712 | n/a |
MA0546 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $11,157 | $1,992 | Not Implemented |
MA0546 # 04 Y:2004 | 04 | 2004 | REDUCE VENTILATION AIR | $7,495 | $1,200 | Implemented |
MA0546 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,827 | $4,972 | Implemented |
MA0546 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,243 | $3,230 | Implemented |
MA0546 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,839 | $282 | Not Implemented |
MA0546 # 08 Y:2004 | 08 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $981 | $720 | Not Implemented |
MA0546 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $832 | $3,000 | Implemented |
IC0071 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,267 | $44,109 | Not Implemented |
IC0071 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,851 | $32,696 | Not Implemented |
IC0071 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,349 | $3,502 | Implemented |
IC0071 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $3,423 | $5,201 | Not Implemented |
IC0071 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,250 | $3,184 | Implemented |
IC0071 # 06 Y:2003 | 06 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,367 | $0 | Implemented |
IC0071 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $553 | $0 | Implemented |
IC0071 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,135 | $0 | Implemented |
IC0071 # 09 Y:2003 | 09 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,477 | $5,700 | Implemented |
IC0071 # 10 Y:2003 | 10 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $339 | $1,887 | Implemented |