Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,199
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0347 # 04 Y:2003 | 04 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,657 | $18,000 | Not Implemented |
AS0347 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $3,155 | $14 | Not Implemented |
AS0347 # 06 Y:2003 | 06 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $720 | $40 | Implemented |
AS0347 # 07 Y:2003 | 07 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $27,104 | $6,400 | Not Implemented |
AS0347 # 08 Y:2003 | 08 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $64,137 | $800 | Not Implemented |
AS0347 # 09 Y:2003 | 09 | 2003 | CLEAR AND RENT EXISTING SPACE | $15,165 | $11,220 | n/a |
LM0053 # 01 Y:2003 | 01 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,027 | $0 | Not Implemented |
LM0053 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,855 | $6,210 | Not Implemented |
LM0053 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $34 | $0 | Not Implemented |
LM0053 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,585 | $3,275 | Not Implemented |
LM0053 # 05 Y:2003 | 05 | 2003 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $64,652 | $4,768 | Not Implemented |
LM0053 # 06 Y:2003 | 06 | 2003 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $37,911 | $24,550 | Not Implemented |
MI0050 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $173,081 | $82,800 | Not Implemented |
MI0050 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $95,397 | $66,000 | Not Implemented |
MI0050 # 03 Y:2002 | 03 | 2002 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $53,360 | $5,000 | Not Implemented |
MI0050 # 04 Y:2002 | 04 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $10,046 | $21,150 | Not Implemented |
MI0050 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,880 | $2 | Not Implemented |
MI0050 # 06 Y:2002 | 06 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $2,860 | $1,338 | Not Implemented |
WV0254 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,829 | $420 | Not Implemented |
WV0254 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,033 | $120 | Implemented |
WV0254 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,900 | $460 | Not Implemented |
WV0254 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,421 | $1,200 | Not Implemented |
WV0254 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,172 | $200 | Implemented |
WV0254 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $755 | $600 | Implemented |
WV0254 # 07 Y:2002 | 07 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,833 | $1,000 | Implemented |