Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,199
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0254 # 08 Y:2002 | 08 | 2002 | INSULATE BARE EQUIPMENT | $1,756 | $483 | Implemented |
WV0254 # 09 Y:2002 | 09 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,809 | $600 | Implemented |
WV0254 # 10 Y:2002 | 10 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,987 | $300 | Implemented |
WV0254 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,240 | $0 | Implemented |
WV0254 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,039 | $3,154 | Implemented |
WV0254 # 13 Y:2002 | 13 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,844 | $4,000 | Not Implemented |
WV0254 # 14 Y:2002 | 14 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,200 | $100 | Implemented |
WV0254 # 15 Y:2002 | 15 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $14,000 | $6,000 | Not Implemented |
CO0514 # 01 Y:2002 | 01 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $273 | $456 | Implemented |
CO0514 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,160 | $2,000 | Not Implemented |
CO0514 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $510 | $770 | Not Implemented |
CO0514 # 04 Y:2002 | 04 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $200 | $0 | Not Implemented |
CO0514 # 05 Y:2002 | 05 | 2002 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $18,470 | $30,800 | Not Implemented |
AS0334 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,317 | $0 | Not Implemented |
AS0334 # 02 Y:2002 | 02 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,247 | $312 | Not Implemented |
AS0334 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $667 | $1,350 | Not Implemented |
AS0334 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $424 | $441 | Not Implemented |
AS0334 # 05 Y:2002 | 05 | 2002 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $32,221 | $12,000 | Not Implemented |
AS0334 # 06 Y:2002 | 06 | 2002 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $3,596 | $60 | Not Implemented |
AS0334 # 07 Y:2002 | 07 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,710 | $5,232 | Not Implemented |
AS0334 # 08 Y:2002 | 08 | 2002 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $3,926 | $85 | Not Implemented |
AS0334 # 09 Y:2002 | 09 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,865 | $8,955 | Not Implemented |
AS0334 # 10 Y:2002 | 10 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $379 | $546 | Not Implemented |
CO0511 # 01 Y:2002 | 01 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,040 | $9,500 | Not Implemented |
CO0511 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $10,160 | $14,010 | Not Implemented |