IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0826 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $552 $250 Not Implemented
MA0826 # 03 Y:2021 03 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,447 $10,800 Not Implemented
MA0826 # 01 Y:2021 01 2021 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $27,883 $250,000 Not Implemented
MA0826 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $979 $1,631 Implemented
MA0826 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,639 $14,650 Not Implemented
MA0826 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $551 $1,450 Implemented
MA0826 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $323 $625 Not Implemented
MA0541 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $635 $260 Implemented
MA0541 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,751 $0 Not Implemented
MA0541 # 06 Y:2003 06 2003 USE MINIMUM STEAM OPERATING PRESSURE $5,023 $5,000 Implemented
MA0541 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,600 $22,000 n/a
MA0541 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,264 $5,500 Implemented
MA0541 # 03 Y:2003 03 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,763 $14,000 Not Implemented
MA0541 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,861 $46,350 Not Implemented
MA0541 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $89,343 $700,000 n/a
MA0541 # 09 Y:2003 09 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $523 $72 Not Implemented
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 04 Y:1998 04 1998 $5,656 $11,874 Not Implemented
MA0428 # 05 Y:1998 05 1998 $5,618 $29,750 Not Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
MA0428 # 01 Y:1998 01 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,280 $2,110 Not Implemented
MA0355 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $62 $102 Not Implemented
MA0355 # 06 Y:1996 06 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $960 $79 Implemented
MA0355 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,888 $52,000 Implemented
MA0355 # 04 Y:1996 04 1996 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $5,576 $24,000 Not Implemented