Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0428 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $642 | $30 | Implemented |
MA0428 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,142 | $980 | Implemented |
MA0428 # 01 Y:1998 | 01 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,280 | $2,110 | Not Implemented |
MA0428 # 04 Y:1998 | 04 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $5,656 | $11,874 | Not Implemented |
MA0428 # 05 Y:1998 | 05 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,618 | $29,750 | Not Implemented |
OR0335 # 01 Y:1998 | 01 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $347,930 | $644,800 | Not Implemented |
OR0335 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,260 | $0 | Not Implemented |
OR0335 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,045 | $1,000 | Implemented |
OR0335 # 04 Y:1998 | 04 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $310 | $0 | Implemented |
OR0330 # 01 Y:1998 | 01 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $335,710 | $438,500 | Not Implemented |
OR0330 # 04 Y:1998 | 04 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $163,740 | $125,000 | Not Implemented |
OR0330 # 05 Y:1998 | 05 | 1998 | OPTIMIZE PLANT POWER FACTOR | $10,538 | $14,800 | Not Implemented |
OR0330 # 03 Y:1998 | 03 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $690 | $0 | Not Implemented |
OR0330 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,900 | $0 | Implemented |
SF0149 # 08 Y:1998 | 08 | 1998 | INSTALL SENSORS TO DETECT DEFECTS | $80,000 | $40,000 | Implemented |
SF0149 # 01 Y:1998 | 01 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $690 | $15 | Implemented |
SF0149 # 07 Y:1998 | 07 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $780 | $145 | Not Implemented |
SF0149 # 04 Y:1998 | 04 | 1998 | INSTALL OCCUPANCY SENSORS | $844 | $2,640 | Not Implemented |
SF0149 # 03 Y:1998 | 03 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $555 | $495 | Not Implemented |
CO0424 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,580 | $1,000 | Not Implemented |
CO0424 # 02 Y:1998 | 02 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $5,030 | $450 | Not Implemented |
SF0149 # 09 Y:1998 | 09 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $117,000 | $400,000 | Implemented |
SF0149 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $368 | $0 | Implemented |
SF0149 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,627 | $25,680 | Implemented |
SF0149 # 05 Y:1998 | 05 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,333 | $5,522 | Not Implemented |