IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0321 # 10 Y:2017 10 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $400 Implemented
MI0321 # 09 Y:2017 09 2017 INSULATE BARE EQUIPMENT $1,612 $1,914 Implemented
MI0321 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,121 $1,508 Not Implemented
MI0321 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,256 $1,660 Implemented
MI0321 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $3,370 $10,745 Not Implemented
MI0321 # 05 Y:2017 05 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,988 $6,400 Not Implemented
MI0321 # 01 Y:2017 01 2017 USE OPTIMUM THICKNESS INSULATION $17,954 $21,920 Implemented
MI0321 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,816 $7,589 Implemented
MI0321 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,233 $3,600 Implemented
MI0321 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,777 $5,492 Not Implemented
NC0599 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,472 $2,940 Not Implemented
NC0599 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,240 $200 Implemented
NC0599 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,262 $500 Not Implemented
NC0599 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $300 $1,500 Implemented
NC0599 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36,992 Implemented
NC0599 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $4,037 $13,627 Implemented
UF0510 # 06 Y:2017 06 2017 INSTALL EQUIPMENT TO MOVE PRODUCT $944,640 $126,336 Implemented
UF0510 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $1,142 $225 Not Implemented
UF0510 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,528 $419 Implemented
UF0510 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $1,757 $0 Not Implemented
UF0510 # 05 Y:2017 05 2017 AUTOMATE FINISHING PROCESS $84,346 $5,030 Implemented
UF0510 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $908 $689 Implemented
AS0439 # 04 Y:2017 04 2017 MAINTAIN MACHINES TO REDUCE LEAKS $734 $545 Not Implemented
AS0439 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,293 $950 Implemented
AS0439 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,146 $4,770 Not Implemented