Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0321 # 10 Y:2017 | 10 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $766 | $400 | Implemented |
MI0321 # 09 Y:2017 | 09 | 2017 | INSULATE BARE EQUIPMENT | $1,612 | $1,914 | Implemented |
MI0321 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,121 | $1,508 | Not Implemented |
MI0321 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,256 | $1,660 | Implemented |
MI0321 # 06 Y:2017 | 06 | 2017 | OPTIMIZE PLANT POWER FACTOR | $3,370 | $10,745 | Not Implemented |
MI0321 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,988 | $6,400 | Not Implemented |
MI0321 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM THICKNESS INSULATION | $17,954 | $21,920 | Implemented |
MI0321 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,816 | $7,589 | Implemented |
MI0321 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,233 | $3,600 | Implemented |
MI0321 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,777 | $5,492 | Not Implemented |
NC0599 # 05 Y:2017 | 05 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,472 | $2,940 | Not Implemented |
NC0599 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,240 | $200 | Implemented |
NC0599 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,262 | $500 | Not Implemented |
NC0599 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $300 | $1,500 | Implemented |
NC0599 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,256 | $36,992 | Implemented |
NC0599 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $4,037 | $13,627 | Implemented |
UF0510 # 06 Y:2017 | 06 | 2017 | INSTALL EQUIPMENT TO MOVE PRODUCT | $944,640 | $126,336 | Implemented |
UF0510 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $1,142 | $225 | Not Implemented |
UF0510 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $1,528 | $419 | Implemented |
UF0510 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $1,757 | $0 | Not Implemented |
UF0510 # 05 Y:2017 | 05 | 2017 | AUTOMATE FINISHING PROCESS | $84,346 | $5,030 | Implemented |
UF0510 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $908 | $689 | Implemented |
AS0439 # 04 Y:2017 | 04 | 2017 | MAINTAIN MACHINES TO REDUCE LEAKS | $734 | $545 | Not Implemented |
AS0439 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,293 | $950 | Implemented |
AS0439 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,146 | $4,770 | Not Implemented |