IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

125

matching recommendations
Reset
SIC 3672 Printed Circuit Boards
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0574 # 06 Y:2024 06 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $264 $267 n/a
AS0574 # 05 Y:2024 05 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $649 $152 n/a
AS0574 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,317 $2,384 n/a
AS0574 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,135 $501 n/a
AS0574 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,540 $1,389 n/a
AS0574 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $29,273 $271,736 n/a
AS0426 # 09 Y:2006 09 2006 USE SOLAR HEAT TO HEAT WATER $3,172 $14,400 Not Implemented
AS0426 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,590 $20,832 Not Implemented
AS0426 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,539 $15,085 Implemented
AS0426 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,221 $1,000 Implemented
AS0426 # 05 Y:2006 05 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,172 $2,000 Not Implemented
AS0426 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $7,727 $5,500 Not Implemented
AS0426 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $8,267 $2,077 Implemented
AS0426 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,823 $500 Implemented
AS0426 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,102 $17,458 Not Implemented
AS0371 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $2,853 $4,125 Not Implemented
AS0371 # 01 Y:2004 01 2004 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $87,632 $105,000 Not Implemented
AS0371 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,038 $22,800 Not Implemented
AS0371 # 03 Y:2004 03 2004 SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL $17,943 $12,000 Not Implemented
AS0371 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,453 $7,000 Not Implemented
AS0371 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,176 $60 Not Implemented
AS0371 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,040 $45,048 Not Implemented
AS0371 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,938 $144 Not Implemented
AS0370 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,258 $39,378 Not Implemented
AS0370 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,545 $16,000 Not Implemented