IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

844

matching recommendations
Reset
SIC 3672 Printed Circuit Boards
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0417 # 10 Y:1998 10 1998 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $61,000 $0 Not Implemented
MA0402 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $217,449 $140,000 Not Implemented
MA0402 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $61,092 $16,597 Not Implemented
MA0402 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,628 $6,075 Not Implemented
MA0402 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,721 $4,925 Not Implemented
MA0402 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,577 $4,275 Not Implemented
MA0402 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $200 Not Implemented
SD0177 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,578 $9,930 Implemented
SD0177 # 02 Y:1997 02 1997 REPLACE BOILER $19,420 $83,000 Not Implemented
SD0177 # 03 Y:1997 03 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,154 $3,900 Not Implemented
SD0177 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $3,056 $2,170 Implemented
SD0177 # 05 Y:1997 05 1997 USE OPTIMUM THICKNESS INSULATION $1,916 $720 Implemented
SD0177 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,318 $6,500 Implemented
SD0177 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,228 $13,068 Implemented
SD0177 # 08 Y:1997 08 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $17,960 $11,180 Implemented
SD0177 # 09 Y:1997 09 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $4,758 $3,000 Implemented
SD0177 # 10 Y:1997 10 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $5,045 $0 Implemented
SD0177 # 11 Y:1997 11 1997 RECOVER AND REUSE COOLING WATER $3,300 $2,000 Implemented
SD0177 # 12 Y:1997 12 1997 INSTALL SYSTEM TO COLLECT SCRAP $69,638 $20,000 Implemented
HO0152 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,638 $5,469 Not Implemented
HO0152 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $241 $245 Not Implemented
HO0152 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $482 $400 Not Implemented
HO0152 # 04 Y:1997 04 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,241 $6,000 Not Implemented
HO0152 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,832 $10,000 Not Implemented
HO0152 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,500 $6,500 Not Implemented