Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
125
matching recommendationsSIC | 3672 | Printed Circuit Boards |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0574 # 06 Y:2024 | 06 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $264 | $267 | n/a |
AS0574 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,317 | $2,384 | n/a |
AS0574 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,135 | $501 | n/a |
AS0574 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,273 | $271,736 | n/a |
AS0574 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,540 | $1,389 | n/a |
AS0574 # 05 Y:2024 | 05 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $649 | $152 | n/a |
AS0426 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,539 | $15,085 | Implemented |
AS0426 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,102 | $17,458 | Not Implemented |
AS0426 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,221 | $1,000 | Implemented |
AS0426 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $7,727 | $5,500 | Not Implemented |
AS0426 # 08 Y:2006 | 08 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,590 | $20,832 | Not Implemented |
AS0426 # 09 Y:2006 | 09 | 2006 | USE SOLAR HEAT TO HEAT WATER | $3,172 | $14,400 | Not Implemented |
AS0426 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $8,267 | $2,077 | Implemented |
AS0426 # 05 Y:2006 | 05 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,172 | $2,000 | Not Implemented |
AS0426 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,823 | $500 | Implemented |
AS0371 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,938 | $144 | Not Implemented |
AS0371 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $2,853 | $4,125 | Not Implemented |
AS0371 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,176 | $60 | Not Implemented |
AS0371 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,040 | $45,048 | Not Implemented |
AS0371 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,038 | $22,800 | Not Implemented |
AS0371 # 03 Y:2004 | 03 | 2004 | SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL | $17,943 | $12,000 | Not Implemented |
AS0371 # 01 Y:2004 | 01 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $87,632 | $105,000 | Not Implemented |
AS0371 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,453 | $7,000 | Not Implemented |
AS0370 # 06 Y:2004 | 06 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,372 | $5,500 | Not Implemented |
AS0370 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,545 | $16,000 | Not Implemented |