IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0569 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $5,717 $3,715 Implemented
AS0569 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $146 Implemented
AS0569 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,436 $18,656 Implemented
SJ0009 # 08 Y:2024 08 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $513 $624 Implemented
SJ0009 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,705 $0 Implemented
SJ0009 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $764 $32 Implemented
SJ0009 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $8 $200 Implemented
SJ0009 # 10 Y:2024 10 2024 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $147 $50 Implemented
SJ0009 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,699 $844 Implemented
DL0220 # 02 Y:2023 02 2023 USE OPTIMUM TEMPERATURE $6,980 $0 Implemented
DL0220 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $8,994 Implemented
DL0220 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $84,324 $0 Implemented
DL0217 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,621 $0 Implemented
DL0217 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $2,650 $0 Implemented
DL0217 # 05 Y:2023 05 2023 REDUCE VENTILATION AIR $29,580 $0 Implemented
DL0217 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,120 $0 Implemented
DL0217 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30,600 $0 Implemented
DL0217 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,180 $0 Implemented
DL0217 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,318 $4,100 Implemented
DL0217 # 08 Y:2023 08 2023 REDUCE VENTILATION AIR $1,715 $750 Implemented
SF0585 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $897 $400 Implemented
SF0585 # 05 Y:2022 05 2022 DEVELOP A REPAIR/REPLACE POLICY $3,867 $8,345 Implemented
SF0585 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,341 $0 Implemented
SF0585 # 02 Y:2022 02 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,174 $2,893 Implemented
DL0190 # 06 Y:2021 06 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $270 $0 Implemented