Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
623
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0334 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $424 | $441 | Not Implemented |
AS0334 # 05 Y:2002 | 05 | 2002 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $32,221 | $12,000 | Not Implemented |
AS0334 # 06 Y:2002 | 06 | 2002 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $3,596 | $60 | Not Implemented |
AS0334 # 07 Y:2002 | 07 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,710 | $5,232 | Not Implemented |
AS0334 # 08 Y:2002 | 08 | 2002 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $3,926 | $85 | Not Implemented |
AS0334 # 09 Y:2002 | 09 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,865 | $8,955 | Not Implemented |
AS0334 # 10 Y:2002 | 10 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $379 | $546 | Not Implemented |
CO0511 # 01 Y:2002 | 01 | 2002 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $12,040 | $9,500 | Not Implemented |
CO0511 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $10,160 | $14,010 | Not Implemented |
CO0511 # 03 Y:2002 | 03 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $990 | Not Implemented |
CO0511 # 04 Y:2002 | 04 | 2002 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,020 | $0 | Not Implemented |
CO0511 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,420 | $190 | Implemented |
CO0511 # 06 Y:2002 | 06 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,290 | $1,200 | Not Implemented |
CO0511 # 07 Y:2002 | 07 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $370 | $300 | Not Implemented |
CO0511 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $0 | Not Implemented |
CO0511 # 09 Y:2002 | 09 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $100 | $0 | Not Implemented |
UF0303 # 01 Y:2002 | 01 | 2002 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $23,984 | $1,074 | Not Implemented |
UF0303 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $6,229 | $358 | Implemented |
UF0303 # 03 Y:2002 | 03 | 2002 | OPTIMIZE PLANT POWER FACTOR | $5,340 | $24,092 | Implemented |
UF0303 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,157 | $29,907 | n/a |
UF0303 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $138,554 | $77,000 | Not Implemented |
UF0303 # 06 Y:2002 | 06 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $13,509 | $4,995 | Implemented |
UF0303 # 07 Y:2002 | 07 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $89,796 | $0 | Not Implemented |
UF0303 # 08 Y:2002 | 08 | 2002 | PAY UTILITY BILLS ON TIME | $7,393 | $0 | Implemented |
LE0135 # 01 Y:2002 | 01 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,955 | $2,500 | Not Implemented |