IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

595

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0066 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $702 $5,938 Not Implemented
UD0905 # 01 Y:2014 01 2014 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $13,929 $0 Not Implemented
UD0905 # 02 Y:2014 02 2014 USE OPTIMUM TEMPERATURE $5,296 $0 Implemented
UD0905 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,682 $0 Implemented
UD0905 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,046 $0 Implemented
UD0905 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,533 $188,160 Implemented
UD0905 # 06 Y:2014 06 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $437 $2,350 Not Implemented
UM0445 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $790 $500 Not Implemented
UM0445 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,158 $24,137 Not Implemented
UM0445 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $515 $2,300 Not Implemented
UM0445 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $118 $500 Implemented
SU0349 # 01 Y:2013 01 2013 PAY BILLS ON TIME TO AVOID LATE FEES $6,610 $0 Implemented
SU0349 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,356 $4,000 Not Implemented
SU0349 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,244 $2,033 Not Implemented
SU0349 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $216 Not Implemented
SU0349 # 05 Y:2013 05 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $882,762 $552,244 Not Implemented
SU0349 # 06 Y:2013 06 2013 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $361,538 $453,062 Not Implemented
SU0349 # 07 Y:2013 07 2013 ELIMINATE/REDUCE AN OPERATION $2,724 $5,760 Not Implemented
SU0349 # 08 Y:2013 08 2013 UPGRADE OBSOLETE EQUIPMENT $3,201 $8,460 Implemented
AM0623 # 01 Y:2012 01 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75,600 $270,000 Not Implemented
AM0623 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,800 $13,240 Not Implemented
AM0623 # 03 Y:2012 03 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $36,640 $10,000 Not Implemented
AM0623 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,838 $500 Not Implemented
AM0623 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,538 $1,045 Not Implemented
AM0623 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $4,500 $8,160 Not Implemented