IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

618

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0173 # 06 Y:2017 06 2017 UPGRADE OBSOLETE EQUIPMENT $17,600 $5,950 Implemented
DL0173 # 07 Y:2017 07 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,800 $3,940 Not Implemented
AM0715 # 01 Y:2016 01 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $566,490 $1,145,213 Not Implemented
AM0715 # 02 Y:2016 02 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $53,960 $0 Not Implemented
AM0715 # 03 Y:2016 03 2016 USE SOLAR HEAT FOR HEAT $31,594 $151,288 Implemented
AM0715 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,530 $50,830 Implemented
AM0715 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,750 $50 Implemented
AM0715 # 06 Y:2016 06 2016 USE OPTIMUM TEMPERATURE $8,060 $9,230 Not Implemented
AM0715 # 07 Y:2016 07 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,830 $4,560 Implemented
AM0715 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $0 Implemented
OK0942 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,767 $3,112 Implemented
OK0942 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,283 $8,000 Not Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 04 Y:2016 04 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $73,902 $31,000 Not Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
OK0942 # 06 Y:2016 06 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $469,328 $2,302,430 Not Implemented
BS0066 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,458 $568 Not Implemented
BS0066 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,531 $26 Not Implemented
BS0066 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,219 $907 Not Implemented
BS0066 # 04 Y:2015 04 2015 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,249 $80 Not Implemented
BS0066 # 05 Y:2015 05 2015 COMBINE UTILITY METERS $258 $253 Not Implemented
BS0066 # 06 Y:2015 06 2015 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $13,061 $19,065 Not Implemented
BS0066 # 07 Y:2015 07 2015 OPTIMIZE PLANT POWER FACTOR $12,093 $25,245 Not Implemented
BS0066 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $702 $5,938 Not Implemented
UD0905 # 01 Y:2014 01 2014 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $13,929 $0 Not Implemented