IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0511 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,420 $190 Implemented
CO0349 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,640 $54,100 Implemented
CO0349 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,690 $7,000 Implemented
CO0349 # 02 Y:1995 02 1995 RECOVER AND REUSE COOLING WATER $18,410 $2,190 Implemented
CO0315 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,010 $5,310 Implemented
CO0315 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,070 $1,770 Implemented
CO0315 # 01 Y:1994 01 1994 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,950 $30 Implemented
CO0293 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $420 Implemented
CO0293 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,220 $9,380 Implemented
CO0216 # 08 Y:1991 08 1991 INSTALL AUTOMATIC STACK DAMPER $440 $1,100 Implemented
CO0216 # 07 Y:1991 07 1991 DISCONNECT BALLASTS $440 $800 Implemented
CO0216 # 06 Y:1991 06 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $240 $250 Implemented
CO0216 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $280 $150 Implemented
CO0216 # 04 Y:1991 04 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $303 $598 Implemented
CO0216 # 03 Y:1991 03 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,100 $800 Implemented
CO0216 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $2,170 Implemented
CO0216 # 01 Y:1991 01 1991 REDUCE VENTILATION AIR $1,400 $500 Implemented
CO0185 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,010 $300 Implemented
CO0185 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,620 $50 Implemented
CO0185 # 03 Y:1990 03 1990 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,390 $200 Implemented
CO0185 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,780 $750 Implemented
CO0184 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,100 Implemented
CO0184 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $8,590 $1,300 Implemented
CO0184 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,500 $4,000 Implemented
CO0184 # 01 Y:1990 01 1990 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,600 $500 Implemented