IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

485

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0151 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $938 $0 Implemented
MO0053 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,665 $29,000 Implemented
MO0053 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,972 $5,350 Implemented
SD0011 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $562 Implemented
AS0003 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $2,943 Implemented
WI0042 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $0 Implemented
WI0042 # 06 Y:1988 06 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $446 $0 Implemented
WI0042 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,012 $250 Implemented
MA0100 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,258 $2,050 Implemented
MA0100 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $200 Implemented
RU0004 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,087 $500 Implemented
RU0004 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,692 $2,800 Implemented
RU0004 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $6,567 $2,800 Implemented
AT0044 # 01 Y:1986 01 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,139 $3,000 Implemented
AT0044 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,956 $300 Implemented
AT0044 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,115 $1,800 Implemented
ST0043 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $100 Implemented
ST0043 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $0 Implemented
ST0043 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $423 $0 Implemented
ST0043 # 09 Y:1985 09 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $357 $33 Implemented
ST0043 # 10 Y:1985 10 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,293 $420 Implemented
CO0035 # 01 Y:1985 01 1985 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,550 $50 Implemented
CO0035 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,285 $2,000 Implemented
CO0035 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $20 Implemented
CO0035 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,959 $4,000 Implemented