IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

481

matching recommendations
Reset
SIC 3679 Electronic Components, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS028 # 05 Y:2012 05 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,762 $5,000 Implemented
MAS028 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,815 $4,000 Implemented
MAS028 # 01 Y:2012 01 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $37,819 $31,800 Implemented
MAS025 # 05 Y:2012 05 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,171 $4,300 Implemented
SU0317 # 01 Y:2012 01 2012 CONDENSE OPERATION INTO ONE BUILDING $333,000 $6,675 Implemented
SU0317 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $9,899 $14,092 Implemented
SU0317 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $2,179 Implemented
SU0317 # 05 Y:2012 05 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,834 $27,300 Implemented
BD0405 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,415 $7,299 Implemented
BD0405 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,286 $15,356 Implemented
BD0405 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $2,161 $1,050 Implemented
BD0405 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $82 $10 Implemented
BD0405 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,704 $40,000 Implemented
LE0328 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,383 $2,500 Implemented
LE0328 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,369 $15,675 Implemented
LE0328 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,650 $3,000 Implemented
LE0328 # 03 Y:2011 03 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,853 $18,000 Implemented
LE0328 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,435 $12,420 Implemented
UF0428 # 01 Y:2009 01 2009 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $1,734 $0 Implemented
UF0428 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,365 $0 Implemented
UF0428 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,980 $5,895 Implemented
UF0428 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $872 $1,971 Implemented
UF0428 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,285 $0 Implemented
UF0428 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,086 $0 Implemented
LL0317 # 04 Y:2009 04 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $637 $623 Implemented