IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

425

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0497 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,054 $4,016 Implemented
WV0497 # 05 Y:2015 05 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,086 $1,000 Implemented
WV0497 # 06 Y:2015 06 2015 DEVELOP A REPAIR/REPLACE POLICY $2,304 $567 Implemented
WV0497 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $340 $192 Implemented
SU0359 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,476 $4,124 Implemented
SU0359 # 01 Y:2014 01 2014 INSULATE FEEDWATER TANK $1,037 $137 Implemented
SU0359 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,651 $1,900 Implemented
SU0359 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,346 $470 Implemented
SU0359 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $931 $855 Implemented
IA0508 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,758 $976 Implemented
IA0508 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,512 $1,000 Implemented
IA0508 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $689 $1,590 Implemented
IA0508 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $6,113 $6,000 Implemented
IA0508 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,845 $1,000 Implemented
IA0508 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $14,349 $3,750 Implemented
WV0474 # 10 Y:2013 10 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $407 $500 Implemented
WV0474 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $324 Implemented
WV0474 # 06 Y:2013 06 2013 DEVELOP A REPAIR/REPLACE POLICY $1,715 $392 Implemented
WV0474 # 05 Y:2013 05 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,920 $72 Implemented
WV0474 # 03 Y:2013 03 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,698 $1,000 Implemented
WV0474 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,986 $15,864 Implemented
IP0014 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,183 $0 Implemented
IP0014 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $0 Implemented
IP0014 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $263 $0 Implemented
IP0014 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,997 $0 Implemented