Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 369 | Misc. Electrical Equipment & Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0130 # 05 Y:2024 | 05 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $7,210 | $13,000 | n/a |
CW0130 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,562 | $17,397 | n/a |
CW0130 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $4,196 | $2,050 | n/a |
CW0130 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,298 | $8,391 | n/a |
CW0130 # 04 Y:2024 | 04 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $202 | $424 | n/a |
CW0130 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,786 | $6,750 | n/a |
UD1020 # 07 Y:2020 | 07 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $901 | $0 | Not Implemented |
UD1020 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $832 | $0 | Not Implemented |
UD1020 # 01 Y:2020 | 01 | 2020 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $11,633 | $8,000 | Not Implemented |
UD1020 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,337 | $22,400 | Not Implemented |
UD1020 # 05 Y:2020 | 05 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,639 | $6,550 | Not Implemented |
UD1020 # 04 Y:2020 | 04 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,584 | $27,600 | Not Implemented |
UD1020 # 03 Y:2020 | 03 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $13,712 | $26,275 | Not Implemented |
UD1020 # 02 Y:2020 | 02 | 2020 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $52,332 | $47,243 | Not Implemented |
UD0999 # 01 Y:2019 | 01 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,762 | $0 | Not Implemented |
UD0999 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,453 | $0 | Implemented |
UD0999 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $6,465 | $596 | Not Implemented |
UD0999 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $4,677 | $353 | Not Implemented |
UD0999 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,669 | $11,170 | Not Implemented |
UD0599 # 06 Y:2000 | 06 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,628 | $0 | Implemented |
UD0599 # 04 Y:2000 | 04 | 2000 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,956 | $2,500 | Implemented |
UD0599 # 09 Y:2000 | 09 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $872 | $500 | Not Implemented |
UD0599 # 02 Y:2000 | 02 | 2000 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $8,795 | $0 | Implemented |
UD0599 # 01 Y:2000 | 01 | 2000 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $10,974 | $10,755 | Not Implemented |
UD0599 # 03 Y:2000 | 03 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,987 | $20,000 | Implemented |