IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 369 Misc. Electrical Equipment & Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0130 # 05 Y:2024 05 2024 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,210 $13,000 n/a
CW0130 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,562 $17,397 n/a
CW0130 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $4,196 $2,050 n/a
CW0130 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,298 $8,391 n/a
CW0130 # 04 Y:2024 04 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $202 $424 n/a
CW0130 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,786 $6,750 n/a
UD1020 # 07 Y:2020 07 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $901 $0 Not Implemented
UD1020 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $832 $0 Not Implemented
UD1020 # 01 Y:2020 01 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $11,633 $8,000 Not Implemented
UD1020 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,337 $22,400 Not Implemented
UD1020 # 05 Y:2020 05 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,639 $6,550 Not Implemented
UD1020 # 04 Y:2020 04 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,584 $27,600 Not Implemented
UD1020 # 03 Y:2020 03 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $13,712 $26,275 Not Implemented
UD1020 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $52,332 $47,243 Not Implemented
UD0999 # 01 Y:2019 01 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,762 $0 Not Implemented
UD0999 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,453 $0 Implemented
UD0999 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $6,465 $596 Not Implemented
UD0999 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $4,677 $353 Not Implemented
UD0999 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,669 $11,170 Not Implemented
UD0599 # 06 Y:2000 06 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,628 $0 Implemented
UD0599 # 04 Y:2000 04 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,956 $2,500 Implemented
UD0599 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $872 $500 Not Implemented
UD0599 # 02 Y:2000 02 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,795 $0 Implemented
UD0599 # 01 Y:2000 01 2000 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $10,974 $10,755 Not Implemented
UD0599 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,987 $20,000 Implemented