Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
291
matching recommendationsSIC | 3691 | Storage Batteries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0110 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,085 | $5,844 | Not Implemented |
LM0110 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $116,775 | $100,000 | Not Implemented |
LM0110 # 04 Y:2006 | 04 | 2006 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $85,569 | $90,000 | Not Implemented |
LM0110 # 05 Y:2006 | 05 | 2006 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $193,195 | $15,800 | Not Implemented |
LM0110 # 06 Y:2006 | 06 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $153,608 | $23,700 | Implemented |
CO0571 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,580 | $500 | Implemented |
CO0571 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,130 | $1,560 | Not Implemented |
CO0571 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,520 | $5,600 | Not Implemented |
CO0571 # 04 Y:2005 | 04 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,540 | $3,240 | Not Implemented |
CO0571 # 05 Y:2005 | 05 | 2005 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $770 | $3,000 | Not Implemented |
CO0571 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,660 | $37,360 | Not Implemented |
CO0571 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $9,920 | $6,000 | Not Implemented |
CO0571 # 08 Y:2005 | 08 | 2005 | INSTALL SKYLIGHTS | $6,230 | $56,000 | Not Implemented |
CO0571 # 09 Y:2005 | 09 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $1,540 | $14,140 | Not Implemented |
CO0571 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $1,000 | Implemented |
AM0446 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $10,000 | $40,000 | Implemented |
AM0446 # 02 Y:2003 | 02 | 2003 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,310 | $0 | Not Implemented |
AM0446 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,850 | $0 | Implemented |
AM0446 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,060 | $0 | Not Implemented |
AM0446 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,060 | $500 | Implemented |
AM0446 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $760 | $650 | Not Implemented |
AM0446 # 07 Y:2003 | 07 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $730 | $250 | Implemented |
AM0446 # 08 Y:2003 | 08 | 2003 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $300 | $0 | Implemented |
AM0446 # 09 Y:2003 | 09 | 2003 | USE PHOTOCELL CONTROLS | $140 | $65 | Not Implemented |
AS0343 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,371 | $20,633 | Implemented |