Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1057 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $1,200 Implemented
UD1057 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,173 $0 Implemented
UD1057 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,974 $952 Implemented
UD1057 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,676 $13,290 Implemented
OK1091 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,017 $630 Implemented
OK1091 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,533 $9,900 Implemented
OK1091 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $2,210 $9,834 Implemented
TT0292 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,314 $15,941 Implemented
TT0292 # 03 Y:2023 03 2023 AIR CONDITION ONLY SPACE NECESSARY $8,884 $18,000 Implemented
TT0292 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,057 $2,190 Implemented
TT0292 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,223 $4,750 Implemented
TT0292 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,268 $50 Implemented
KS2315 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,991 $5,960 Implemented
KS2315 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $33,086 $235,752 Implemented
KS2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,175 $24,588 Implemented
KS2315 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $4,028 $6,350 Implemented
SF0597 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,268 $0 Implemented
SF0597 # 02 Y:2023 02 2023 ADD AREA LIGHTING SWITCHES $11,388 $100 Implemented
SF0597 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $53,882 $13,192 Implemented
SF0597 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $322,164 $2,251,041 Implemented
NT0001 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,144 $5,801 Implemented
NT0001 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,452 $9,984 Implemented
NT0001 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,130 $1,258 Implemented
NT0001 # 05 Y:2023 05 2023 INSTALL SET-BACK TIMERS $883 $0 Implemented
NT0001 # 06 Y:2023 06 2023 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,710 $0 Implemented