Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
124
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2309 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $957 | $1,596 | Implemented |
UL2309 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,637 | $0 | Implemented |
UL2309 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,305 | $2,688 | Implemented |
UL2309 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,370 | $18,360 | Implemented |
UL2305 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,738 | $0 | Implemented |
UL2305 # 08 Y:2023 | 08 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,779 | $0 | Implemented |
UL2305 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,322 | $500 | Implemented |
UL2216 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,227 | $10,882 | Implemented |
UL2216 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,028 | $0 | Implemented |
UL2216 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,213 | $960 | Implemented |
UL2216 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $67,103 | $45,461 | Implemented |
UL2216 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,196 | $2,730 | Implemented |
UK1908 # 13 Y:2019 | 13 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,547 | $8,300 | Implemented |
UK1908 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $116,074 | $438,000 | Implemented |
UK1908 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,190 | $3,038 | Implemented |
UK1908 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,319 | $0 | Implemented |
UK1908 # 17 Y:2019 | 17 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,430 | $0 | Implemented |
UK1908 # 07 Y:2019 | 07 | 2019 | DISCONNECT BALLASTS | $383 | $72 | Implemented |
UK1908 # 06 Y:2019 | 06 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,551 | $0 | Implemented |
UK1908 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,676 | $22,903 | Implemented |
UK1908 # 15 Y:2019 | 15 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $63,247 | $2,368 | Implemented |
UK1908 # 12 Y:2019 | 12 | 2019 | CLEAN CONDENSER TUBES | $15,832 | $7,858 | Implemented |
UK1908 # 09 Y:2019 | 09 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,838 | $1,900 | Implemented |
UK1803 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,186 | $0 | Implemented |
UK1803 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $3,813 | $2,725 | Implemented |