Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL2016 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,588 | $3,733 | Implemented |
CL2016 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $5,838 | $656 | Implemented |
CL2016 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,376 | $1,720 | Implemented |
CL2016 # 06 Y:2020 | 06 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $797 | $0 | Implemented |
CL2016 # 07 Y:2020 | 07 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $567 | $0 | Implemented |
CL2016 # 08 Y:2020 | 08 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,055 | $2,500 | Implemented |
CL1904 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,719 | $44,796 | Implemented |
CL1904 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,689 | $0 | Implemented |
CL1904 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $13,034 | $38,500 | Implemented |
CL1901 # 02 Y:2019 | 02 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,260 | $0 | Implemented |
CL1901 # 03 Y:2019 | 03 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,184 | $0 | Implemented |
CL1901 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,368 | $13,023 | Implemented |
NC0568 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $179,170 | $887,700 | Implemented |
NC0568 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,081 | $200 | Implemented |
GT0859 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54,936 | $12,000 | Implemented |
GT0859 # 03 Y:2008 | 03 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $14,029 | $0 | Implemented |
GT0859 # 04 Y:2008 | 04 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,526 | $6,000 | Implemented |
GT0829 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,481 | $500 | Implemented |
NC0338 # 01 Y:2006 | 01 | 2006 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $63,286 | $175,000 | Implemented |
NC0338 # 03 Y:2006 | 03 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,391 | $2,500 | Implemented |
NC0338 # 04 Y:2006 | 04 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $20,374 | $75,000 | Implemented |
NC0338 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,416 | $16,843 | Implemented |
NC0338 # 06 Y:2006 | 06 | 2006 | COVER OPEN TANKS | $1,097 | $1,600 | Implemented |
GT0602 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,980 | $1,000 | Implemented |
GT0602 # 03 Y:1996 | 03 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $690 | $300 | Implemented |