IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0335 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,331 $15,000 Implemented
UM0335 # 05 Y:2008 05 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,221 $500 Implemented
WV0372 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,813 $2,000 Implemented
WV0372 # 03 Y:2008 03 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,188 $511 Implemented
WV0372 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,593 $8,011 Implemented
WV0372 # 06 Y:2008 06 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,074 $4,500 Implemented
WV0372 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $3,550 $890 Implemented
WV0372 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,523 $0 Implemented
MS0324 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,635 $343 Implemented
MS0324 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,347 $19,752 Implemented
UD0776 # 06 Y:2008 06 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $30,220 $0 Implemented
UD0776 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,929 $1,000 Implemented
SD0402 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,022 $11,175 Implemented
SD0402 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,363 $900 Implemented
SD0403 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,381 $13,275 Implemented
IA0418 # 02 Y:2008 02 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228 $244 Implemented
IA0418 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $456 $252 Implemented
SD0403 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,157 $15,033 Implemented
SD0403 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $148,069 $13,073 Implemented
IA0418 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,360 $1,100 Implemented
IA0418 # 07 Y:2008 07 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,001 $788 Implemented
IA0418 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $845 $770 Implemented
IA0418 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,939 $20,513 Implemented
IA0418 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $24 Implemented