IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,513

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0109 # 05 Y:1998 05 1998 RECOVER AND REUSE COOLING WATER $555 $1,200 Not Implemented
UM0109 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $44,450 $100 Implemented
UF0192 # 01 Y:1998 01 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,313 $1,200 Implemented
UF0192 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,830 $1,850 Implemented
UF0192 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $626 $844 Implemented
UF0192 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,669 $3,114 Implemented
UF0192 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $36,140 $0 Implemented
UF0192 # 06 Y:1998 06 1998 SELL COMBUSTIBLE WASTE $14,456 $1,000 Not Implemented
UF0192 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,200 $2,400 Not Implemented
CO0400 # 01 Y:1997 01 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,570 $1,000 Not Implemented
CO0400 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,292 $1,356 Implemented
CO0400 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,220 $420 Implemented
CO0400 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $630 $0 Implemented
CO0400 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $450 $0 Not Implemented
CO0400 # 06 Y:1997 06 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,100 $1,800 Implemented
IA0180 # 01 Y:1997 01 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $45,671 $8,400 Not Implemented
IA0180 # 02 Y:1997 02 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,858 $2,000 Not Implemented
IA0180 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,423 $992 Implemented
IA0180 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $4,378 Not Implemented
IA0180 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $443 $400 Not Implemented
IA0180 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $699 $931 Not Implemented
IA0180 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $292 Implemented
IA0180 # 08 Y:1997 08 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $175 $130 Implemented
SD0185 # 01 Y:1997 01 1997 USE OPTIMUM THICKNESS INSULATION $11,371 $2,170 Not Implemented
SD0185 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $4,451 $3,200 Not Implemented