IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0259 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300,781 $111,421 Implemented
TT0259 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $62,325 $1,640 Implemented
TT0259 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,112 $13,000 Not Implemented
TT0259 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,779 $2,738 Implemented
TT0259 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,579 $16,000 Not Implemented
TT0259 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $5,951 $1,314 Not Implemented
TT0259 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,907 $5,500 Not Implemented
TT0259 # 08 Y:2021 08 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,752 $400 Not Implemented
TT0253 # 08 Y:2021 08 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $245 $25 Implemented
TT0253 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $500 Implemented
TT0253 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $395 $40 Not Implemented
TT0253 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $479 $900 Implemented
TT0253 # 04 Y:2021 04 2021 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,829 $1,408 Not Implemented
TT0253 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,036 $3,000 Not Implemented
TT0253 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,898 $70,582 Implemented
TT0253 # 01 Y:2021 01 2021 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $63,457 $40,000 Implemented
TT0249 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,071 $325 Not Implemented
TT0249 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $87,163 $208,768 Implemented
TT0249 # 02 Y:2021 02 2021 USE SOLAR HEAT FOR HEAT $66,558 $342,530 Not Implemented
TT0249 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $17,343 $140,000 Not Implemented
TT0249 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,133 $1,500 Implemented
TT0249 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,717 $5,000 Not Implemented
TT0249 # 07 Y:2021 07 2021 MINIMIZE WATER USAGE $846 $1,753 Not Implemented
TT0236 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,754 $2,700 Not Implemented
TT0236 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $28,173 $90,000 Not Implemented