Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,504
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0252 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,022 | $4,053 | Not Implemented |
IC0252 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,710 | $5,524 | Not Implemented |
IC0252 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $16,762 | $27,372 | Not Implemented |
IC0252 # 04 Y:2021 | 04 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,533 | $230 | Not Implemented |
IP0151 # 01 Y:2021 | 01 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $759 | $18 | Implemented |
IP0151 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,626 | $271 | Implemented |
IP0151 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $2,159 | $767 | Implemented |
IP0151 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,612 | $34,884 | Implemented |
IP0151 # 05 Y:2021 | 05 | 2021 | REPLACE BOILER | $26,645 | $57,558 | Implemented |
IP0150 # 01 Y:2021 | 01 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $952 | $0 | Implemented |
IP0150 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $702 | $150 | Implemented |
IP0150 # 03 Y:2021 | 03 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $357 | $9 | Implemented |
IP0150 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $423 | $42 | Implemented |
IP0150 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $654 | $1,559 | Implemented |
MI0394 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,463 | $480 | Implemented |
MI0394 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,537 | $1,380 | Not Implemented |
MI0394 # 03 Y:2021 | 03 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,170 | $2,549 | Not Implemented |
MI0394 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,060 | $14,609 | Not Implemented |
MI0394 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,836 | $2,100 | Not Implemented |
MI0394 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,427 | $1,980 | Implemented |
MI0394 # 07 Y:2021 | 07 | 2021 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,040 | $616 | Not Implemented |
MI0394 # 08 Y:2021 | 08 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,367 | $2,549 | Implemented |
UU0192 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,219 | $52,219 | Implemented |
UU0192 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,872 | $40,613 | Implemented |
UU0192 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,994 | $15,475 | Implemented |