IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

194

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0354 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $140 Implemented
CO0354 # 06 Y:1996 06 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $190 $0 Not Implemented
CO0312 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,660 $3,200 Implemented
CO0312 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $1,960 $1,050 Implemented
CO0312 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,410 $210 Not Implemented
CO0312 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $-290 Implemented
CO0312 # 05 Y:1994 05 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $500 $150 Not Implemented
CO0312 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $380 $320 Implemented
CO0312 # 07 Y:1994 07 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $300 $100 Not Implemented
CO0297 # 01 Y:1994 01 1994 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $21,300 $16,000 Not Implemented
CO0297 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,150 $34,110 Not Implemented
CO0297 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,820 $3,430 Implemented
CO0297 # 04 Y:1994 04 1994 REUSE RAGS UNTIL COMPLETELY SOILED $4,520 $1,160 Not Implemented
CO0297 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,280 $3,260 Implemented
CO0297 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,200 $5,880 Not Implemented
CO0297 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,120 $920 Not Implemented
CO0297 # 08 Y:1994 08 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $290 $530 Not Implemented
CO0287 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,770 $7,180 Not Implemented
CO0287 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,180 $16,170 Implemented
CO0287 # 03 Y:1993 03 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,360 $2,500 Not Implemented
CO0285 # 01 Y:1993 01 1993 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $92,610 $6,220 Not Implemented
CO0285 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $9,680 $2,010 Not Implemented
CO0285 # 03 Y:1993 03 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,720 $8,500 Not Implemented
CO0285 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $7,020 Not Implemented
CO0285 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $130 Not Implemented