IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0244 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,140 $2,000 Not Implemented
NC0244 # 05 Y:2002 05 2002 USE PHOTOCELL CONTROLS $167 $150 Implemented
NC0244 # 06 Y:2002 06 2002 USE SOLAR HEAT TO HEAT WATER $3,554 $8,775 Not Implemented
NC0207 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $423 $2,700 Not Implemented
NC0207 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,148 $750 Implemented
NC0207 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $16,705 $10,000 Implemented
NC0207 # 04 Y:2001 04 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,272 $12,600 Implemented
NC0207 # 05 Y:2001 05 2001 AIR CONDITION ONLY SPACE NECESSARY $13,400 $12,400 Implemented
TN0675 # 01 Y:2000 01 2000 DEVELOP A REPAIR/REPLACE POLICY $72,335 $1,075 Not Implemented
TN0675 # 02 Y:2000 02 2000 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $20,125 $25,600 Not Implemented
TN0675 # 03 Y:2000 03 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $18,800 $16,000 Implemented
TN0675 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,789 $16,600 Implemented
TN0675 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $8,725 $6,000 Implemented
TN0675 # 06 Y:2000 06 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,450 $3,300 Implemented
TN0675 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,844 $0 Not Implemented
TN0659 # 01 Y:1999 01 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $135,000 $32,200 Implemented
TN0659 # 02 Y:1999 02 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $15,965 $4,260 Not Implemented
TN0659 # 03 Y:1999 03 1999 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,520 $10,300 Not Implemented
TN0659 # 04 Y:1999 04 1999 PURCHASE APPROPRIATELY SIZED MATERIAL $5,860 $0 Not Implemented
TN0659 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,642 $1,860 Implemented
TN0659 # 06 Y:1999 06 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,890 $3,060 Not Implemented
TN0659 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $590 $131 Not Implemented
NC0125 # 01 Y:1997 01 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $34,969 $195,000 Not Implemented
NC0125 # 02 Y:1997 02 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,740 $1,600 Not Implemented
NC0125 # 03 Y:1997 03 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,586 $0 Not Implemented