IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

845

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0984 # 07 Y:2018 07 2018 USE RADIANT HEATER FOR SPOT HEATING $42,420 $47,500 Not Implemented
UD0984 # 08 Y:2018 08 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $22,981 $69,925 Not Implemented
UD0984 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $11,000 Implemented
UD0984 # 10 Y:2018 10 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,271 $21,975 Not Implemented
UD0973 # 01 Y:2017 01 2017 METER WASTE WATER $6,762 $1,000 Not Implemented
UD0973 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $73,029 $100,000 Not Implemented
UD0973 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,320 $1,000 Not Implemented
UD0973 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $23,858 $8,000 Not Implemented
UD0973 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,317 $40 Not Implemented
UD0973 # 06 Y:2017 06 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,445 $0 Not Implemented
UD0973 # 07 Y:2017 07 2017 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $58,900 $97,666 Not Implemented
UD0973 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,858 $0 Not Implemented
UD0973 # 09 Y:2017 09 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,323 $3,821 Not Implemented
UD0973 # 10 Y:2017 10 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,232 $10,000 Not Implemented
UD0973 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,134 $44,200 Not Implemented
WV0550 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,622 $254 Implemented
WV0550 # 02 Y:2017 02 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,325 $1,000 Implemented
WV0550 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $13,118 $15,322 Not Implemented
WV0550 # 04 Y:2017 04 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $11,740 $40,000 Not Implemented
WV0550 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,954 $0 Implemented
WV0550 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,544 $16,928 Implemented
WV0550 # 07 Y:2017 07 2017 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $6,922 $31,792 Not Implemented
WV0550 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,057 $30,000 Not Implemented
WV0550 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $4,238 $3,925 Implemented
WV0550 # 10 Y:2017 10 2017 OPTIMIZE PLANT POWER FACTOR $4,200 $14,250 Not Implemented