IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0698 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,148 $325 Implemented
OR0698 # 01 Y:2018 01 2018 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $32,214 $597 Not Implemented
OR0698 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,374 $9,440 Implemented
OR0698 # 03 Y:2018 03 2018 USE HEAT PUMP FOR SPACE CONDITIONING $12,461 $22,850 Implemented
OR0488 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $680 $2,000 Not Implemented
OR0488 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $600 $200 Implemented
OR0488 # 03 Y:2005 03 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,100 $132,000 Implemented
OR0448 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,100 $5,000 Implemented
OR0448 # 03 Y:2004 03 2004 $14,430 $1,000 Not Implemented
OR0448 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $0 Implemented
OR0448 # 04 Y:2004 04 2004 $247,000 $1,382,000 Not Implemented
OR0413 # 02 Y:2002 02 2002 $214,000 $5,000 Implemented
OR0413 # 04 Y:2002 04 2002 $3,500 $2,800 Not Implemented
OR0413 # 03 Y:2002 03 2002 $142,400 $25,000 n/a
OR0413 # 05 Y:2002 05 2002 $1,250,300 $29,300 n/a
OR0413 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $220 $50 Implemented
OR0413 # 01 Y:2002 01 2002 $10,000 $1,200 Not Implemented
OR0402 # 01 Y:2001 01 2001 UPGRADE OBSOLETE EQUIPMENT $53,000 $45,000 Implemented
OR0402 # 02 Y:2001 02 2001 $6,880 $1,230 Implemented
OR0402 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $1,310 $1,100 Not Implemented
OR0402 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $3,600 Not Implemented
OR0339 # 01 Y:1999 01 1999 $5,106,400 $556,000 Not Implemented
OR0339 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $178 $0 Not Implemented
OR0339 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $730 $381 Not Implemented
OR0339 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $254 $1,000 Implemented