IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

297

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0276 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,566 $20,159 Implemented
MS0276 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,492 $8,838 Not Implemented
MS0276 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,547 $15,656 Not Implemented
MS0276 # 06 Y:2005 06 2005 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,712 $1,848 Not Implemented
MS0276 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,158 $1,871 Implemented
MS0276 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $478 Not Implemented
MA0578 # 01 Y:2005 01 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $86,353 $20,000 Implemented
MA0578 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,684 $4,800 Not Implemented
MA0578 # 03 Y:2005 03 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,767 $25,000 Implemented
MA0578 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $318 $327 Not Implemented
MA0578 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,718 $5,475 Implemented
MA0578 # 06 Y:2005 06 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $36,304 $600 Implemented
MA0578 # 07 Y:2005 07 2005 INSTALL TIMERS AND/OR THERMOSTATS $54,679 $800 Not Implemented
UM0281 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,337 $300 Implemented
UM0281 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,591 $3,891 Implemented
UM0281 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,961 $75 Implemented
UM0281 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,214 $75 Implemented
UM0281 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $125 $100 Implemented
LM0098 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $700 Implemented
LM0098 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $148 $308 Not Implemented
LM0098 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,413 $6,375 Not Implemented
LM0098 # 04 Y:2005 04 2005 $94,133 $49,500 Implemented
LM0098 # 05 Y:2005 05 2005 $216,000 $11,800 Implemented
LM0098 # 06 Y:2005 06 2005 $30,000 $20,000 Not Implemented
LM0098 # 07 Y:2005 07 2005 $27,000 $50,000 Not Implemented