IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0392 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,511 $66,554 Implemented
IA0392 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,749 $7,994 Implemented
IA0392 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,893 $3,850 Not Implemented
IA0392 # 05 Y:2006 05 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,308 $735 Implemented
IA0392 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,268 $2,268 Implemented
IA0392 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,514 $1,650 Implemented
IA0392 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $657 $1,300 Not Implemented
OK0734 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,049 $15,000 Not Implemented
OK0734 # 02 Y:2006 02 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $33,532 $47,764 Implemented
OK0734 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,323 $5,175 Implemented
OK0734 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $219 $1,290 Not Implemented
OK0734 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,594 $1,150 Not Implemented
OK0734 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $237 $1,013 Not Implemented
OK0734 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $3,000 $500 Implemented
OK0731 # 01 Y:2006 01 2006 USE SOLAR HEAT FOR HEAT $97,944 $80,060 Not Implemented
OK0731 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,213 $0 Implemented
OK0731 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,514 $3,851 Not Implemented
OK0731 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,650 $9,975 Not Implemented
OK0731 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $1,071 $3,949 Implemented
OK0731 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $727 Implemented
OK0731 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,083 $68,849 Implemented
NC0338 # 01 Y:2006 01 2006 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $63,286 $175,000 Implemented
NC0338 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $54,759 $18,800 Not Implemented
NC0338 # 03 Y:2006 03 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,391 $2,500 Implemented
NC0338 # 04 Y:2006 04 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $20,374 $75,000 Implemented