Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0260 # 01 Y:2004 01 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,413 $10,000 Not Implemented
UM0260 # 02 Y:2004 02 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $33,620 $12,000 Implemented
UM0260 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,181 $13,690 Not Implemented
UM0260 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,671 $1,000 Implemented
UM0260 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,831 $2,000 Implemented
UM0260 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,283 $1,050 Implemented
UM0260 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,054 $1,564 Not Implemented
UM0221 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $40,400 $4,000 Implemented
UM0221 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,486 $7,425 Implemented
UM0221 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,720 $2,000 Not Implemented
UM0221 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $1,250 Implemented
UM0221 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,750 $12,870 Not Implemented
UM0221 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,580 $42,883 Not Implemented
UM0221 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $2,000 Not Implemented
UM0221 # 08 Y:2002 08 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,075 $3,000 Not Implemented
UM0221 # 09 Y:2002 09 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,340 $8,500 Not Implemented
UM0221 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,125 $2,000 Not Implemented
UM0214 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $5,260 $4,500 Not Implemented
UM0214 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $142,000 $30,400 Implemented
UM0214 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $4,540 $2,200 Not Implemented
UM0214 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $850 $375 Implemented
UM0214 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,439 $1,000 Not Implemented
UM0203 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,603 $13,218 Not Implemented
UM0203 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,642 $1,150 Not Implemented
UM0203 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,091 $600 Not Implemented