IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0297 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,920 $4,114 Implemented
NC0297 # 07 Y:2004 07 2004 USE PHOTOCELL CONTROLS $100 $130 Implemented
UU0066 # 01 Y:2004 01 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,690 $3,000 Not Implemented
UU0066 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $340 $200 Not Implemented
UU0066 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $84 $310 Implemented
UU0066 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $241 $45 Implemented
UU0066 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $81 $270 Not Implemented
UU0066 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $199 $80 Not Implemented
UU0066 # 07 Y:2004 07 2004 PAY BILLS ON TIME TO AVOID LATE FEES $414 $0 Implemented
TA0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,280 $720 Implemented
TA0079 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,200 $7,680 Not Implemented
TA0079 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,240 $300 Not Implemented
TA0079 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,490 $200 Implemented
TA0079 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,450 $720 Implemented
TA0079 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $637 $0 Not Implemented
TA0079 # 07 Y:2004 07 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $280 $0 Implemented
UM0263 # 01 Y:2004 01 2004 EXPAND OPERATIONS INTO UNUSED SPACE $72,800 $11,600 Not Implemented
UM0263 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,652 $1,350 Not Implemented
UM0263 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,527 $16,352 Not Implemented
UM0263 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,280 $9,583 Not Implemented
UM0263 # 05 Y:2004 05 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $4,026 $11,000 Not Implemented
UM0263 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,663 $50 Not Implemented
UM0263 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,670 $500 Not Implemented
UM0263 # 08 Y:2004 08 2004 COVER OPEN TANKS $912 $100 Not Implemented
UM0263 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $880 $3,280 Not Implemented