IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0139 # 09 Y:1999 09 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $70,000 $50,000 Implemented
UM0116 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $364 $980 Not Implemented
UM0116 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $663 $2,419 Implemented
UM0116 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $364 $1,200 Implemented
UM0116 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $19,654 $4,350 Implemented
UM0116 # 05 Y:1998 05 1998 METER WASTE WATER $1,447 $150 Implemented
UM0116 # 06 Y:1998 06 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $28,299 $0 Not Implemented
UM0116 # 07 Y:1998 07 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $2,565 $0 Implemented
UM0109 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $208 Implemented
UM0109 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $2,743 Not Implemented
UM0109 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $851 $400 Not Implemented
UM0109 # 04 Y:1998 04 1998 INSTALL SKYLIGHTS $504 $2,100 Not Implemented
UM0109 # 05 Y:1998 05 1998 RECOVER AND REUSE COOLING WATER $555 $1,200 Not Implemented
UM0109 # 06 Y:1998 06 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $44,450 $100 Implemented
UM0099 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,644 $12,823 Not Implemented
UM0099 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $194 $200 Not Implemented
UM0099 # 03 Y:1997 03 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,407 $4,500 Not Implemented
UM0099 # 04 Y:1997 04 1997 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $3,527 $6,000 Not Implemented
UM0099 # 05 Y:1997 05 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,291 $0 Not Implemented
ND0280 # 01 Y:1997 01 1997 CLEAR AND RENT EXISTING SPACE $160,000 $5,000 Not Implemented
ND0280 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,439 $8,055 Implemented
ND0280 # 03 Y:1997 03 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $6,707 $10,000 Not Implemented
ND0280 # 04 Y:1997 04 1997 MODIFY CURRENT INCENTIVE PROGRAM $5,000 $176 Implemented
ND0280 # 05 Y:1997 05 1997 RECOVER WASTE HEAT FROM EQUIPMENT $3,321 $2,180 Not Implemented
ND0280 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,854 $520 Implemented