IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

669

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0904 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $777 $384 Not Implemented
UD0904 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $66,236 $75,700 Implemented
UD0904 # 09 Y:2014 09 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,039 $0 Not Implemented
UD0904 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $16,866 $20,982 Implemented
UD0904 # 11 Y:2014 11 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,786 $10,400 Implemented
UD0904 # 12 Y:2014 12 2014 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $96,196 $72,000 Not Implemented
UD0904 # 13 Y:2014 13 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $69,423 $62,000 Not Implemented
UD0904 # 14 Y:2014 14 2014 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $47,628 $1,300 Not Implemented
UD0872 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $10,877 $5,000 Implemented
UD0872 # 02 Y:2013 02 2013 DEVELOP A REPAIR/REPLACE POLICY $17,313 $23,026 Implemented
UD0872 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $994 $0 Implemented
UD0872 # 04 Y:2013 04 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $142,557 $165,900 Not Implemented
UD0872 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,335 $15,900 Not Implemented
UD0872 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $33,247 $3,000 Implemented
UD0872 # 07 Y:2013 07 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,025 $21,037 Not Implemented
UD0872 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,506 $0 Not Implemented
UD0872 # 09 Y:2013 09 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,452 $5,725 Not Implemented
UD0872 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,273 $31,000 Not Implemented
UD0872 # 11 Y:2013 11 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $4,252 $2,000 Implemented
UD0872 # 12 Y:2013 12 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $2,274 $5,000 Not Implemented
UD0872 # 13 Y:2013 13 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $538 $1,000 Implemented
UD0872 # 14 Y:2013 14 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,883 $41,766 Not Implemented
UD0872 # 15 Y:2013 15 2013 INSTALL TIMERS AND/OR THERMOSTATS $14,454 $16,450 Not Implemented
UM0418 # 01 Y:2012 01 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $795,000 $1,715,000 Not Implemented
UM0418 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,459 $84,630 Implemented