Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0527 # 04 Y:2022 | 04 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,708 | $26 | Not Implemented |
SU0527 # 05 Y:2022 | 05 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $877 | $32 | Not Implemented |
SU0527 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $484 | $224 | Not Implemented |
SU0527 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,990 | $1,787 | Not Implemented |
SU0527 # 08 Y:2022 | 08 | 2022 | INSULATE BARE EQUIPMENT | $18,264 | $9,030 | Not Implemented |
SU0527 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,474 | $24,111 | Not Implemented |
SU0527 # 10 Y:2022 | 10 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,423 | $248,940 | Not Implemented |
IC0273 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,366 | $2,851 | Not Implemented |
IC0273 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,794 | $4,100 | Not Implemented |
IC0273 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $879 | $841 | Not Implemented |
IC0273 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $200 | $35 | Not Implemented |
IC0273 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $279,174 | $2,543,426 | Not Implemented |
UL2214 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,238 | $1,046,392 | Not Implemented |
UL2214 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,721 | $432,345 | Not Implemented |
UL2214 # 03 Y:2022 | 03 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,475 | $0 | Not Implemented |
UL2214 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $626 | $3,993 | Not Implemented |
UL2214 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,543 | $0 | Not Implemented |
UL2214 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,187 | $1,760 | Not Implemented |
UL2214 # 07 Y:2022 | 07 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $612 | $0 | Not Implemented |
TT0284 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,705 | $50,300 | Not Implemented |
TT0284 # 02 Y:2023 | 02 | 2023 | MINIMIZE WATER USAGE | $10,675 | $240 | Implemented |
TT0284 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,764 | $13,000 | Implemented |
TT0284 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,557 | $3,205 | Not Implemented |
TT0284 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $7,905 | $7,500 | Not Implemented |
TT0284 # 06 Y:2023 | 06 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $3,153 | $6,000 | Not Implemented |