IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0064 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,972 $12,040 Implemented
AR0064 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,884 $800 Implemented
AR0064 # 08 Y:1995 08 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $4,142 $822 Not Implemented
AR0064 # 09 Y:1995 09 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,852 $3,000 Not Implemented
AR0064 # 10 Y:1995 10 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $53,591 $4,900 Not Implemented
AR0064 # 11 Y:1995 11 1995 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,776 $1,750 Implemented
AR0064 # 12 Y:1995 12 1995 MINIMIZE WATER USAGE $1,104 $100 Implemented
IA0119 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,440 $1,537 Implemented
IA0119 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,564 $135 Implemented
IA0119 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $758 $25 Not Implemented
IA0119 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $815 $250 Implemented
IA0119 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $510 $25 Implemented
IA0119 # 06 Y:1995 06 1995 USE OPTIMUM THICKNESS INSULATION $303 $1,020 Implemented
IA0119 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $169 Implemented
IA0119 # 08 Y:1995 08 1995 INSTALL OCCUPANCY SENSORS $784 $920 Not Implemented
IA0119 # 09 Y:1995 09 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $909 $1,570 Implemented
IA0119 # 10 Y:1995 10 1995 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $15,944 $2,290 Not Implemented
MS0030 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,709 $3,855 Implemented
MS0030 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $579 $1,200 Implemented
MS0030 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,047 $200 Not Implemented
MS0030 # 04 Y:1995 04 1995 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $1,870 $5,100 Not Implemented
MS0030 # 05 Y:1995 05 1995 USE RE-USABLE FILTERS $1,400 $420 Not Implemented
MS0030 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $957 $800 Not Implemented
MS0030 # 07 Y:1995 07 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $125 $20 Implemented
UL0130 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $922 $0 Not Implemented