Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0064 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,972 | $12,040 | Implemented |
AR0064 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,884 | $800 | Implemented |
AR0064 # 08 Y:1995 | 08 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,142 | $822 | Not Implemented |
AR0064 # 09 Y:1995 | 09 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,852 | $3,000 | Not Implemented |
AR0064 # 10 Y:1995 | 10 | 1995 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $53,591 | $4,900 | Not Implemented |
AR0064 # 11 Y:1995 | 11 | 1995 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,776 | $1,750 | Implemented |
AR0064 # 12 Y:1995 | 12 | 1995 | MINIMIZE WATER USAGE | $1,104 | $100 | Implemented |
IA0119 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,440 | $1,537 | Implemented |
IA0119 # 02 Y:1995 | 02 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,564 | $135 | Implemented |
IA0119 # 03 Y:1995 | 03 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $758 | $25 | Not Implemented |
IA0119 # 04 Y:1995 | 04 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $815 | $250 | Implemented |
IA0119 # 05 Y:1995 | 05 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $510 | $25 | Implemented |
IA0119 # 06 Y:1995 | 06 | 1995 | USE OPTIMUM THICKNESS INSULATION | $303 | $1,020 | Implemented |
IA0119 # 07 Y:1995 | 07 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $948 | $169 | Implemented |
IA0119 # 08 Y:1995 | 08 | 1995 | INSTALL OCCUPANCY SENSORS | $784 | $920 | Not Implemented |
IA0119 # 09 Y:1995 | 09 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $909 | $1,570 | Implemented |
IA0119 # 10 Y:1995 | 10 | 1995 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $15,944 | $2,290 | Not Implemented |
MS0030 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,709 | $3,855 | Implemented |
MS0030 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $579 | $1,200 | Implemented |
MS0030 # 03 Y:1995 | 03 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,047 | $200 | Not Implemented |
MS0030 # 04 Y:1995 | 04 | 1995 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $1,870 | $5,100 | Not Implemented |
MS0030 # 05 Y:1995 | 05 | 1995 | USE RE-USABLE FILTERS | $1,400 | $420 | Not Implemented |
MS0030 # 06 Y:1995 | 06 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $957 | $800 | Not Implemented |
MS0030 # 07 Y:1995 | 07 | 1995 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $125 | $20 | Implemented |
UL0130 # 01 Y:1995 | 01 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $922 | $0 | Not Implemented |