IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0178 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,197 $9,700 Not Implemented
UU0178 # 06 Y:2021 06 2021 Hire Energy Manager $25,000 $7,800 Not Implemented
CL2016 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,588 $3,733 Implemented
CL2016 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $5,838 $656 Implemented
CL2016 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $1,720 Implemented
CL2016 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,257 $43,750 Not Implemented
CL2016 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $967 $400 Not Implemented
CL2016 # 06 Y:2020 06 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $797 $0 Implemented
CL2016 # 07 Y:2020 07 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Implemented
CL2016 # 08 Y:2020 08 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,055 $2,500 Implemented
NC0655 # 01 Y:2020 01 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $92,988 $168,000 Not Implemented
NC0655 # 02 Y:2020 02 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $49,654 $612,000 Not Implemented
NC0655 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,039 $500 Not Implemented
NC0655 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $310 $500 Implemented
UA0235 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,903 $5,078 Not Implemented
UA0235 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $16,096 $8,577 Not Implemented
UA0235 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,979 $2,094 Implemented
UA0235 # 04 Y:2021 04 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,001 $808 Implemented
UA0235 # 05 Y:2021 05 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $26,697 $150 Implemented
UA0235 # 06 Y:2021 06 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,383 $708 Not Implemented
UA0235 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,137 $81 Implemented
UU0176 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $156,566 $187,200 Not Implemented
UU0176 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $94,747 $42,608 Implemented
UU0176 # 03 Y:2021 03 2021 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,753 $10,400 Implemented
UU0176 # 04 Y:2021 04 2021 OPTIMIZE PLANT POWER FACTOR $23,470 $21,270 Not Implemented