Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1803 # 19 Y:2018 | 19 | 2018 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $14,567 | $0 | Implemented |
CL1801 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,074 | $111,703 | Not Implemented |
CL1801 # 02 Y:2018 | 02 | 2018 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $47,531 | $15,500 | Not Implemented |
CL1801 # 03 Y:2018 | 03 | 2018 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $25,853 | $4,700 | Not Implemented |
CL1801 # 04 Y:2018 | 04 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $13,900 | $22,500 | Not Implemented |
CL1801 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,775 | $4,800 | Not Implemented |
CL1801 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,788 | $2,080 | Not Implemented |
MA0787 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT FOR HEAT | $76,722 | $790,840 | Not Implemented |
MA0787 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,589 | $100 | Implemented |
MA0787 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,796 | $100 | Implemented |
MA0787 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,111 | $100 | Implemented |
MA0787 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $660 | $100 | Implemented |
OR0698 # 01 Y:2018 | 01 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $32,214 | $597 | Not Implemented |
OR0698 # 02 Y:2018 | 02 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $18,374 | $9,440 | Implemented |
OR0698 # 03 Y:2018 | 03 | 2018 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,461 | $22,850 | Implemented |
OR0698 # 04 Y:2018 | 04 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,148 | $325 | Implemented |
TT0206 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,406 | $32,616 | Not Implemented |
TT0206 # 02 Y:2018 | 02 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $6,182 | $25 | Not Implemented |
TT0206 # 03 Y:2018 | 03 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $428 | $150 | Not Implemented |
UA0187 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,441 | $1,892 | Not Implemented |
UA0187 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $67,895 | $250 | Not Implemented |
UA0187 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,219 | $6,260 | Implemented |
UA0187 # 04 Y:2017 | 04 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,082 | $14,405 | Not Implemented |
UA0187 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,032 | $136,663 | Implemented |
UA0187 # 06 Y:2017 | 06 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $88,008 | $0 | Implemented |