IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0717 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $380 $100 n/a
CO0717 # 05 Y:2015 05 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,660 $13,800 n/a
CO0717 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,080 $3,220 n/a
CO0717 # 06 Y:2015 06 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,270 $1,000 n/a
CO0717 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $480 n/a
CO0717 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,880 $35,080 n/a
CO0717 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,160 $2,130 n/a
CO0400 # 04 Y:1997 04 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $630 $0 Implemented
CO0400 # 05 Y:1997 05 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $450 $0 Not Implemented
CO0400 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,292 $1,356 Implemented
CO0400 # 06 Y:1997 06 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $35,100 $1,800 Implemented
CO0400 # 01 Y:1997 01 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,570 $1,000 Not Implemented
CO0400 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,220 $420 Implemented
CO0377 # 01 Y:1996 01 1996 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $517,560 $5,000 Not Implemented
CO0377 # 05 Y:1996 05 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $850 $290 Not Implemented
CO0377 # 04 Y:1996 04 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,865 $3,550 Not Implemented
CO0377 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,610 $50,000 Not Implemented
CO0377 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $300 $280 Not Implemented
CO0377 # 03 Y:1996 03 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $2,810 $6,710 Not Implemented
CO0377 # 06 Y:1996 06 1996 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $840 $560 Not Implemented
CO0367 # 02 Y:1996 02 1996 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $6,360 $2,000 Not Implemented
CO0368 # 04 Y:1996 04 1996 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,520 $7,000 Implemented
CO0368 # 07 Y:1996 07 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $46 $115 Implemented
CO0368 # 06 Y:1996 06 1996 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $460 $280 Implemented
CO0367 # 03 Y:1996 03 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,440 $8,000 Implemented