IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0356 # 08 Y:2023 08 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,202 $7,540 Not Implemented
MZ0356 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $29,176 $63,400 Not Implemented
MZ0356 # 09 Y:2023 09 2023 REPLACE TREATED WATER WITH WELL / SURFACE WATER $10,677 $100,000 Not Implemented
MZ0356 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,117 $14,802 Implemented
MZ0356 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $135,000 $306,035 Not Implemented
MZ0356 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,120 $2,680 Implemented
MZ0356 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $519 $415 Implemented
MZ0356 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $525,252 $3,450,533 Not Implemented
MZ0356 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,731 $440 Not Implemented
MZ0343 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,951 $31,059 n/a
MZ0343 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,303 $5,150 n/a
MZ0343 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,711 $360 n/a
MZ0343 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $175,679 $545,812 n/a
MZ0343 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,575 $28,807 n/a
MZ0343 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $126,570 $196,842 n/a
MZ0343 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,510 $9,100 n/a
MZ0343 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,726 $2,400 n/a
MZ0343 # 04 Y:2023 04 2023 REPAIR AND ELIMINATE STEAM LEAKS $8,146 $1,330 n/a
MZ0324 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $269 $340 Implemented
MZ0324 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $65,010 $664,200 Not Implemented
MZ0324 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,278 $240 Implemented
MZ0324 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,260 $480 Implemented
MZ0324 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,182 $17,137 Not Implemented
MZ0324 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,050 $7,800 Implemented
MZ0292 # 05 Y:2020 05 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $130 $50 Implemented