IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0429 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,143 $0 n/a
MS0428 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,631 $131,059 n/a
MS0428 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $788 $1,677 n/a
MS0429 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,731 $8,233 n/a
MS0429 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $5,847 $35,728 n/a
MS0428 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $647 $0 n/a
OK1107 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,963 $3,416 n/a
OK1107 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,278 $792 n/a
OK1107 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,761 $0 n/a
OK1107 # 07 Y:2024 07 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $461 $354 n/a
OK1107 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,461 $20,075 n/a
OK1107 # 02 Y:2024 02 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $99,540 $804,825 n/a
OK1107 # 08 Y:2024 08 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,517 $1,048 n/a
OK1107 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $33,098 $353,808 n/a
MZ0356 # 09 Y:2023 09 2023 REPLACE TREATED WATER WITH WELL / SURFACE WATER $10,677 $100,000 Not Implemented
MZ0356 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,117 $14,802 Implemented
MZ0356 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,731 $440 Not Implemented
MZ0356 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $135,000 $306,035 Not Implemented
MZ0356 # 08 Y:2023 08 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,202 $7,540 Not Implemented
MZ0356 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $525,252 $3,450,533 Not Implemented
MZ0356 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $519 $415 Implemented
MZ0356 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $29,176 $63,400 Not Implemented
MZ0356 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,120 $2,680 Implemented
UF0608 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,291 $322,608 Not Implemented
UF0608 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,445 $25,640 Not Implemented