IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0297 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,920 $4,114 Implemented
NC0297 # 07 Y:2004 07 2004 USE PHOTOCELL CONTROLS $100 $130 Implemented
NC0207 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,148 $750 Implemented
NC0207 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $16,705 $10,000 Implemented
NC0207 # 04 Y:2001 04 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,272 $12,600 Implemented
NC0207 # 05 Y:2001 05 2001 AIR CONDITION ONLY SPACE NECESSARY $13,400 $12,400 Implemented
TN0659 # 01 Y:1999 01 1999 $135,000 $32,200 Implemented
TN0659 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,642 $1,860 Implemented
NC0125 # 06 Y:1997 06 1997 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $129,253 $33,480 Implemented
NC0026 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,424 $500 Implemented
NC0026 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,139 $1,646 Implemented
NC0026 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $972 $210 Implemented
NC0003 # 01 Y:1993 01 1993 USE PHOTOCELL CONTROLS $381 $159 Implemented
NC0003 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $648 $360 Implemented
NC0003 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,625 $300 Implemented
NC0003 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,844 $1,000 Implemented
NC0003 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $6,594 $6,000 Implemented
NC0003 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $307 $650 Implemented
AT0099 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $359 $0 Implemented
AT0099 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $179 $366 Implemented
AT0099 # 01 Y:1988 01 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,458 $30,640 Implemented
AT0096 # 09 Y:1988 09 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,785 $2,500 Implemented
AT0096 # 07 Y:1988 07 1988 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,050 $600 Implemented
AT0096 # 03 Y:1988 03 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,633 $1,297 Implemented
AT0096 # 02 Y:1988 02 1988 KEEP LAMPS AND REFLECTORS CLEAN $6,328 $7,000 Implemented