IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,792

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0392 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,749 $7,994 Implemented
IA0392 # 05 Y:2006 05 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,308 $735 Implemented
IA0392 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,268 $2,268 Implemented
IA0392 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,514 $1,650 Implemented
BD0309 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,400 $1,800 Implemented
BD0309 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,190 $0 Implemented
BD0309 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $809 $1,000 Implemented
BD0309 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,023 $1,880 Implemented
BD0309 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $653 $1,200 Implemented
BD0309 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $309 $475 Implemented
UM0297 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,156 $3,450 Implemented
UM0297 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,020 $872 Implemented
UM0297 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,215 $6,601 Implemented
MS0283 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,008 $50,375 Implemented
MS0283 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $247 Implemented
UM0289 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $164,291 $74,114 Implemented
UM0289 # 03 Y:2005 03 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $37,184 $11,610 Implemented
UM0289 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,576 $2,500 Implemented
UM0289 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $9,600 $1,400 Implemented
UM0288 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,386 $10,000 Implemented
UM0288 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,865 $150 Implemented
UM0288 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,004 $400 Implemented
UM0288 # 05 Y:2005 05 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $656 $0 Implemented
UM0288 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $616 $150 Implemented
UM0288 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $159 $25 Implemented