IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,827

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0010 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,519 $6,182 Implemented
ND0010 # 02 Y:1991 02 1991 OPTIMIZE PLANT POWER FACTOR $25,245 $39,150 Implemented
ND0010 # 03 Y:1991 03 1991 SUBSTITUTE AIR FOR STEAM TO ATOMIZE OIL $573 $0 Implemented
UD0355 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,825 $0 Implemented
UD0355 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $3,503 $10,000 Implemented
UD0355 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $7,437 $2,800 Implemented
UD0355 # 04 Y:1991 04 1991 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,886 $30,000 Implemented
UD0355 # 05 Y:1991 05 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,400 $0 Implemented
IA0002 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,080 $100 Implemented
IA0002 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $545 $2,336 Implemented
IA0002 # 04 Y:1991 04 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,727 $100 Implemented
IA0002 # 05 Y:1991 05 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $527 $0 Implemented
IA0002 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $446 $300 Implemented
IA0002 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $261 Implemented
IA0002 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $230 $50 Implemented
OK0337 # 01 Y:1991 01 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $59,130 $29,025 Implemented
OK0337 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $24,414 $1,184 Implemented
OK0337 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,667 $0 Implemented
OK0337 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $758 $0 Implemented
OK0337 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $43,178 $4,650 Implemented
OK0337 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,940 $0 Implemented
OK0337 # 07 Y:1991 07 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,537 $26,342 Implemented
TN0421 # 01 Y:1991 01 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $30,358 $17,288 Implemented
TN0421 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,865 $390 Implemented
TN0421 # 03 Y:1991 03 1991 CLOSE OFF UNNEEDED STEAM LINES $1,536 $0 Implemented