IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2016 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $5,838 $656 Implemented
CL2016 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $1,720 Implemented
CL2016 # 06 Y:2020 06 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $797 $0 Implemented
CL2016 # 07 Y:2020 07 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Implemented
CL2016 # 08 Y:2020 08 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,055 $2,500 Implemented
CL2016 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,588 $3,733 Implemented
MZ0292 # 12 Y:2020 12 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,528 $502,000 Implemented
MZ0292 # 09 Y:2020 09 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,588 $240 Implemented
MZ0292 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $43 $73 Implemented
MZ0292 # 05 Y:2020 05 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $130 $50 Implemented
MZ0292 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,098 $5,000 Implemented
MZ0292 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $460 $1,000 Implemented
MZ0292 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,645 $29,820 Implemented
MZ0292 # 13 Y:2020 13 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,837 $450 Implemented
UU0170 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $13,868 $2,000 Implemented
UU0170 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
UU0170 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $676 $440 Implemented
UU0170 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,825 $21,841 Implemented
GT0945 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $5,988 $1,504 Implemented
GT0945 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,320 $23,111 Implemented
GT0945 # 03 Y:2020 03 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,180 $2,000 Implemented
GT0945 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,333 $300 Implemented
GT0945 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $39,291 $1,575 Implemented
TT0236 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,250 $128,083 Implemented
TT0236 # 02 Y:2020 02 2020 ADOPT IN-HOUSE MATERIAL GENERATION $28,629 $16,000 Implemented