Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
287
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0259 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,907 | $5,500 | Not Implemented |
TT0249 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,717 | $5,000 | Not Implemented |
TT0249 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $17,343 | $140,000 | Not Implemented |
TT0249 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $87,163 | $208,768 | Implemented |
TT0249 # 07 Y:2021 | 07 | 2021 | MINIMIZE WATER USAGE | $846 | $1,753 | Not Implemented |
TT0249 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,133 | $1,500 | Implemented |
TT0249 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,071 | $325 | Not Implemented |
TT0249 # 02 Y:2021 | 02 | 2021 | USE SOLAR HEAT FOR HEAT | $66,558 | $342,530 | Not Implemented |
TT0236 # 08 Y:2020 | 08 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,653 | $2,150 | Not Implemented |
TT0236 # 07 Y:2020 | 07 | 2020 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $1,908 | $500 | Not Implemented |
TT0236 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $206 | $450 | Not Implemented |
TT0236 # 09 Y:2020 | 09 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $984 | $1,500 | Not Implemented |
TT0236 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $28,173 | $90,000 | Not Implemented |
TT0236 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,574 | $40 | Not Implemented |
TT0236 # 02 Y:2020 | 02 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $28,629 | $16,000 | Implemented |
TT0236 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,754 | $2,700 | Not Implemented |
TT0236 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,250 | $128,083 | Implemented |
TT0236 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,447 | $15,750 | Not Implemented |
TT0231 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,957 | $153,710 | Implemented |
TT0231 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $886 | $40 | Implemented |
TT0231 # 06 Y:2019 | 06 | 2019 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $650 | $1,650 | Implemented |
TT0231 # 02 Y:2019 | 02 | 2019 | INSTALL COMMON HEADER ON COMPRESSORS | $13,982 | $1,050 | Implemented |
TT0231 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,033 | $25 | Implemented |
TT0231 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $4,149 | $10,500 | Implemented |
TT0229 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,772 | $12,000 | Not Implemented |