Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0644 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,750 | $1,000 | Implemented |
CO0644 # 03 Y:2010 | 03 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,030 | $35,000 | Implemented |
CO0644 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,750 | $15,000 | Implemented |
CO0644 # 05 Y:2010 | 05 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,500 | $27,500 | Not Implemented |
CO0644 # 06 Y:2010 | 06 | 2010 | REDUCE VENTILATION AIR | $1,390 | $12,400 | Implemented |
MI0196 # 01 Y:2010 | 01 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $157,910 | $102,500 | Implemented |
MI0196 # 02 Y:2010 | 02 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $113,486 | $143,892 | Not Implemented |
MI0196 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $108,082 | $2,000 | Implemented |
MI0196 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,243 | $1,210 | Implemented |
MI0196 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,467 | $40 | Not Implemented |
MI0196 # 06 Y:2010 | 06 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,786 | $4,531 | Not Implemented |
UF0435 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $60,031 | $5,388 | Not Implemented |
UF0435 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,247 | $18,650 | Implemented |
UF0435 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,927 | $9,651 | Implemented |
UF0435 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $634 | $20 | Implemented |
UF0435 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,752 | $772 | Not Implemented |
MI0194 # 01 Y:2010 | 01 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $75,044 | $1,800 | Not Implemented |
MI0194 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,336 | $80,304 | Implemented |
MI0194 # 03 Y:2010 | 03 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $32,237 | $65,613 | Not Implemented |
MI0194 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,923 | $1,210 | Implemented |
MI0194 # 05 Y:2010 | 05 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,899 | $3,903 | Not Implemented |
MI0194 # 06 Y:2010 | 06 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,190 | $2,000 | Implemented |
MI0189 # 01 Y:2010 | 01 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,179 | $5,366 | Not Implemented |
MI0189 # 02 Y:2010 | 02 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,451 | $2,000 | Implemented |
MI0189 # 03 Y:2010 | 03 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,033 | $10,500 | Implemented |