Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0402 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,006 | $1,413 | Not Implemented |
UF0402 # 09 Y:2007 | 09 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,931 | $2,136 | Not Implemented |
UF0402 # 10 Y:2007 | 10 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,194 | $390 | Implemented |
UF0402 # 11 Y:2007 | 11 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,118 | $1,373 | Not Implemented |
UF0402 # 12 Y:2007 | 12 | 2007 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,259 | $8,400 | Not Implemented |
UF0402 # 13 Y:2007 | 13 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $24,897 | $0 | Implemented |
DL0004 # 01 Y:2007 | 01 | 2007 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $39,666 | $0 | Implemented |
DL0004 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,000 | $97,570 | Not Implemented |
DL0004 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,160 | $800 | Not Implemented |
DL0004 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,933 | $500 | Not Implemented |
DL0004 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,506 | $33,000 | Not Implemented |
DL0004 # 06 Y:2007 | 06 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $93,700 | $130,000 | Not Implemented |
DL0004 # 07 Y:2007 | 07 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,203 | $8,830 | Not Implemented |
OK0741 # 01 Y:2007 | 01 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $144,120 | $500,000 | Not Implemented |
OK0741 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,666 | $860 | Not Implemented |
OK0741 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,334 | $7,480 | Not Implemented |
OK0741 # 04 Y:2007 | 04 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,042 | $6,800 | Not Implemented |
OK0741 # 05 Y:2007 | 05 | 2007 | INSTALL SET-BACK TIMERS | $273 | $248 | Not Implemented |
NC0354 # 01 Y:2007 | 01 | 2007 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $39,874 | $45,600 | Not Implemented |
NC0354 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,774 | $100,000 | Not Implemented |
NC0354 # 03 Y:2007 | 03 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $65,972 | $100,000 | Not Implemented |
NC0354 # 04 Y:2007 | 04 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,076 | $2,000 | Not Implemented |
NC0354 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,375 | $100 | Implemented |
NC0354 # 06 Y:2007 | 06 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $7,411 | $2,000 | Implemented |
NC0354 # 07 Y:2007 | 07 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,714 | $1,000 | Not Implemented |