Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0806 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,300 | $23,431 | Not Implemented |
GT0806 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,600 | $2,613 | Not Implemented |
GT0806 # 06 Y:2005 | 06 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $28,900 | $135,800 | Not Implemented |
GT0806 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,000 | $59,670 | Not Implemented |
GT0806 # 08 Y:2005 | 08 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,300 | $13,870 | Not Implemented |
UD0715 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,797 | $53,464 | Implemented |
UD0715 # 02 Y:2005 | 02 | 2005 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $21,170 | $62,500 | Not Implemented |
UD0715 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,402 | $100 | Implemented |
UD0715 # 04 Y:2005 | 04 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,597 | $500 | Implemented |
UD0715 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,021 | $0 | Implemented |
UD0715 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,689 | $0 | Not Implemented |
UD0715 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $781 | $340 | Implemented |
UD0715 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $130 | Not Implemented |
UD0715 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $531 | $0 | Implemented |
AS0395 # 01 Y:2005 | 01 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $5,134 | $10,000 | Implemented |
AS0395 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,439 | $1,000 | Implemented |
AS0395 # 03 Y:2005 | 03 | 2005 | INSTALL OCCUPANCY SENSORS | $429 | $1,950 | Implemented |
AS0395 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $872 | $800 | Implemented |
AS0395 # 05 Y:2005 | 05 | 2005 | USE SOLAR HEAT TO HEAT WATER | $1,228 | $1,100 | Not Implemented |
AS0395 # 06 Y:2005 | 06 | 2005 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $7,600 | $380 | Not Implemented |
UM0278 # 01 Y:2005 | 01 | 2005 | COVER OPEN TANKS | $33,962 | $480 | Implemented |
UM0278 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,116 | $2,200 | Implemented |
UM0278 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,140 | $3,000 | Not Implemented |
UM0278 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $618 | $184 | Implemented |
UM0278 # 05 Y:2005 | 05 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $333 | $850 | Not Implemented |